GRAVITY GOODS ROPEWAY
PRACTICAL ACTION NEPAL OFFICE
Access for Opportunities
QUANTITY ESTIMATE: Chhimkeswori Gravity Ropeway
SN
A
1
2
Description
Upper Station
Site clearance
Earth work in excavation
Anchorage block
Platform
RCC Pillar at front
Side walls foundation
Back wall
Sheave anchorage
3 Rubble stone masonary(1:6)
Anchorage block
Long wall back
Short wall
Main
Front wall
side walls
Back wall
Pillar
Sheave anchorage
Long wall
Short wall
4 PCC for RCC work (1:2:4)
Pillar basement
Pillar
Beam
Post
Anchorage post
Sheave anchorage
Floor
Deduction
5
Plumb concrete (1:3:6) +40%
boulders
Anchor block
Sheave anchoring block
No Length m
1 3.20
1 4.00
2 1.4
2 6.40
1 4.00
1 2.40
1 3.20
2 1.50
1 4.00
2 6.40
1 4.00
2 1.40
2 2.40
2 0.90
2 1.40
2 3.80
1 3.00
4 0.40
2 1.80
2 0.90
1 6.40
(2.35*1.5)X.08
1 2.60
1 0.90
Breadth
m
Height
m
Quantity Unit
45.00 m²
m³
5.10 16.32
6.70 26.80
1 1.2 3.36
8.50 108.8
0.50 1.60 3.2
1.50 0.30 1.08
159.56
m³
0.30 1.80 1.73
0.30 1.53 1.37
0.00
1.00 0.25 1.00
0.50 1.20 7.68
0.50 1.60 3.20
0.50 0.65 0.91
0.30 1.00 1.44
0.30 1.00 0.54
Total
17.87
m³
1.40 0.20 0.78
0.45 0.45 1.54
0.45 0.45 0.61
0.40 0.60 0.38
0.13 0.45
0.40 0.80 0.58
3.00 0.08 1.54
-0.14
Total
5.74
m³
1.50 1.53 5.97
0.76 0.80 0.70
80