7.5 Mixing, placing and curing concrete
7.6 Sheave alignment fixing
7.7 Erection of wire ropes
7.8 Sheds
7.9 Landing platform
8 CONSTRUCTION RECORDS
8.1 Time sheets
8.2 Design modification or work alteration record
8.3 Site instruction book
8.4 Site diary
9 OPERATION AND MAINTENANCE
9.1 General safety precautions
9.2 Components needing special care
9.3 First aid
9.4 Tools
10 COMMUNICATION
10.1 Telephone
10.2 Hoarding/notice boards or information board
11 INSTITUTIONAL ARRANGEMENT
11.1 Policy level
11.2 Planning level
11.3 Implementation level
11.4 Institutional capacity building requirements
12 ENVIRONMENTAL ASSESSMENTS
12.1 Socioeconomic and cultural impact
12.2 Biological impact
12.3 Physical impact
12.5 Recommended mitigation measures
12.6 Check list for environmental parameters
ANNEXES
ACRONYMS
GLOSSARY OF TERMS USED
34
37
37
39
39
41
41
41
42
42
43
43
44
46
46
47
47
48
49
49
50
50
52
53
53
54
54
54
54
55-129
130
131-134