If the measures do not take
hold:
-> site rating remains
negative (-)
Overall rating 2
3. Plant Design and
Construction
Selection of plant design
Locally customary type of
plant:
Arguments in favor of
floating-drum plant:
Arguments in favor of fixe-
dome plant:
Arguments in favor of other
plant(s):
Type of plant chosen:
Selection of site
Availability of building
materials
Bricks/blocks/stone:
Cement:
Metal:
Sand:
Piping/fittings:
Miscellaneous:
Availability of gas
appliances
Cookers:
Lamps:
...
...
Overall rating 3
Data
4. Plant operation /
maintenance / repair
Assessment of plant
operation
Incidental work:
Work expenditure in h:
Persons responsible:
Rating with regard to
anticipated implementation:
Plant maintenance
Maintenance-intensive
components:
Maintenance work by user:
Maintenance work by
external assistance:
Rating with regard too
anticipated implementation:
Plant repair
Components liable to need
repair:
Repairs that can be made
by the user:
Repairs requiring external
assistance:
Data
-o+
Rating
-o+
Rating
-o+
-o+
-o+
35