Introduction to concrete building products
Practical Action
STOCK LOG
To be completed at beginning and end of shift
Date:
Material
Start of Shift
Materials
End of Shift
Sand Bins
e.g. almost empty
half full
Gravel Bins
Cement
5.2 bags
2.5 bags
Other (e.g. mould oil)
Moulds
Start of Shift
End of Shift
In use
Available
In use
Product 1
Product 2
Product 3
etc.
Products
Start of Shift
End of Shift
Curing
Availab Total
le
Sold
Wasted Made
Product 1
etc.
Shift No:
Comment
1 tonne of sand
delivered
Available
Wasted
Curing
Availab Total
le
20